UP Power Push: 95 New Substations Under 2026-27 Business Plan
With electricity demand across Uttar Pradesh rising steadily across domestic households, agricultural belts, commercial hubs, and industrial corridors, the state government is rolling out a major grid-strengthening push for the 2026–27 financial year. Guided by Chief Minister Yogi Adityanath and Energy Minister Arvind Kumar Sharma, the Uttar Pradesh Power Corporation Limited (UPPCL) has formulated a detailed roadmap under the Additional Business Plan (ABP) 2026–27 aimed at expanding substation capacity, modernizing medium- and high-tension distribution lines, and curbing voltage fluctuations and tripping. According to Principal Secretary (Energy) and UPPCL Chairman Ranveer Prasad, the plan targets critical bottlenecks across the state's distribution utilities—including Madhyanchal Vidyut Vitran Nigam Limited (MVVNL), Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL), Purvanchal Vidyut Vitran Nigam Limited (PuVVNL), Paschimanchal Vidyut Vitran Nigam Limited (PVVNL), and Kanpur Electricity Supply Company (KESCO). For electricity consumers, farmers, and small businesses across central and eastern Uttar Pradesh—including residents in Unnao (served under MVVNL's distribution zone) and neighboring hubs such as Lucknow, Kanpur, Prayagraj, and Varanasi—upgrading local substations and separating overloaded feeders promises more dependable power availability for daily life and economic activity.
Substations and Distribution Transformers: Core Capacity Upgrades Under ABP 2026–27
A central pillar of UPPCL's Additional Business Plan 2026–27 is adding fresh transformation capacity where load growth has strained existing infrastructure while upgrading thousands of distribution transformers (DTs) and substations already in service:
| Infrastructure Component | Proposed Scope of Work | Outlay / Financial Provision |
| New 33/11 kV Power Substations | Construction of 95 new 33/11 kV substations across the state | ₹221.01 crore |
| Existing Substation Capacity Enhancement | Capacity augmentation across 302 existing substations | ₹76.64 crore |
| Existing DT Substation Augmentation | Capacity enhancement across 12,528 existing DT substations | ₹746.68 crore |
Line Expansion, 11 kV Feeder Segregation, and Industrial Reliability
Beyond substation additions, the Additional Business Plan 2026–27 allocates substantial funding toward building new corridors, reinforcing aging conductors, and separating agricultural and general/industrial feeders so faults on one line do not disrupt unrelated consumers:
-
New 33 kV Lines and Bays: ₹748.62 crore proposed across 638 works involving new 33 kV line construction and bay installations.
-
Strengthening of 33 kV Lines: ₹400.73 crore earmarked across 949 works to reinforce existing 33 kV lines.
-
11 kV Line Construction and Bifurcation: ₹780.44 crore allocated across 32,354 works covering new 11 kV line construction and feeder separation/bifurcation.
-
33 kV Link Lines, Industrial Feeders, and Line Crossings: Includes ₹93.29 crore for 339 works of 33 kV link lines and bays, ₹41.99 crore for 134 works linked to industrial feeders, and ₹28.94 crore for 390 works addressing 33 kV line crossings.
Delivering Reliable Urban and Rural Power Across Discom Zones
As UPPCL Chairman Ranveer Prasad noted, aligning grid expansion with Chief Minister Yogi Adityanath's reliability mandate is designed to ease technical constraints ahead of peak summer and agricultural load cycles. Tailored to the regional requirements of PuVVNL, MVVNL, DVVNL, PVVNL, and KESCO, timely execution of these works across substations and distribution lines aims to deliver steadier, higher-quality electricity to both rural and urban consumers throughout Uttar Pradesh.